Rajo INCA Plant
Client
CODELCO
Location
Salvador, Chile
Scope
Development of basic and detailed engineering to increase concentrator capacity from 32 KTPD to 37 ktpd.
Technical Data
- CAPEX: USD 1.5 billion
- Expansion of primary flotation, first-cleaner flotation, scavenger flotation, regrinding, and copper filtration equipment.
- Integration of a vertical mill into collective-flotation regrinding circuit
- New tailings dam













