Diamante Project
Client
CODELCO
Location
División el Teniente, Chile
Scope
Development of the basic and detailed engineering for underground mining.
Datos técnicos
- 44 km of tunnels
- 700,000 m3 of excavation
- 60,000 m2 conditioned area
- 1,800 tonnes of explosives
- 1.5 km of railway
• 8.3 MVA of installed power
• 2.5 km of main access road
• 10.7 million man-hours