Racaycocha Project

Client

Grupo Peñoles – México​

Location

Áncash, Perú​

Scope

Development of FEL 2A and FEL 2B Prefeastibility Engineering for the integrated project (60 KTPD).

Technical Data

  • CAPEX 3,350 MUSD​
  • Mine Design​
  • Processing Plant
  • Concentrate Transportation​
  • Tailings Storage Facility
  • Power and Water Supply​
  • Port Infrastructure​
  • Workshops and Camp Facilities

More about the project