Scope

Development and integration of multidisciplinary detailed engineering to increase zinc production by 100,000 t/year through new direct-leaching, purification, and electrowinning facilities, including the buildings, auxiliary services, and modifications required for integration into the existing plant.

Technical Data

  • Production increase: 100,000 t/year of zinc ingot.
  • Total capacity after expansion: 340,000 t/year.
  • New purification line capacity: 120,000 t/year — 150 m³/h.
  • Electrowinning plant: 80 cells arranged in two lines of 40 cells.
  • Design configuration: 112 cathodes per cell.
  • Main electrical system: two 30 MVA, 120 kA each.