Met-Mex Peñoles
Client
Industrias Peñoles
Location
Torreón, Coahuila, México
Scope
Development and integration of multidisciplinary detailed engineering to increase zinc production by 100,000 t/year through new direct-leaching, purification, and electrowinning facilities, including the buildings, auxiliary services, and modifications required for integration into the existing plant.
Technical Data
- Production increase: 100,000 t/year of zinc ingot.
- Total capacity after expansion: 340,000 t/year.
- New purification line capacity: 120,000 t/year — 150 m³/h.
- Electrowinning plant: 80 cells arranged in two lines of 40 cells.
- Design configuration: 112 cathodes per cell.
- Main electrical system: two 30 MVA, 120 kA each.